ESS Twin Screw Supercharger 8psi |
Page 5 of 5. Goto Page 2 Page 3 Page 4 Page 5
Near the end of the installation. After the car had finally started fine with my good old ECU plugged, it was time to put back all the covers and the bumper. I know the engine is dirty but I'll do a good clean as soon as I get the car into my driveway.
Starter cable positive terminal in place.
Blower fan cover in place
Fan secured with brand new push-lock pins
The TS pulley close
The pump wire going into the ECU box. Sealed it with silicone
ECU box finally closed and sealed.
Oil vapor hose is too long, so we shortened it a bit
Plastic cover mounting holes (between radiator and bumper)
Pump secured
Secured all cables under the TS
Connected oil recirc. hose
Shortened it a bit to fit perfectly
Brake booster hose connected and tightened
Injector Cover on!!
Pollen Filter housing
Cutting the extra long hoses
Almost done..
Brake booster
Strut bar
Wires & hose across the engine all setup
Modifying the plastic cover between bumper and radiator to fit.
Cable ties hold the heat exchanger hoses
DONE
This is a short video of the first TS2 start. More to follow
Page 5 of 5. Goto Page 2 Page 3 Page 4 Page 5
|