ESS Twin Screw Supercharger 8psi

Page 5 of 5. Goto Page 2 Page 3 Page 4 Page 5

 

Near the end of the installation. After the car had finally started fine with my good old ECU plugged, it was time to put back all the covers and the bumper. I know the engine is dirty but I'll do a good clean as soon as I get the car into my driveway.

 

 

Starter cable positive terminal in place.

 

 

Blower fan cover in place

 

 

Fan secured with brand new push-lock pins

 

The TS pulley close

 

 

 

 

 

The pump wire going into the ECU box. Sealed it with silicone

 

ECU box finally closed and sealed.

 

Oil vapor hose is too long, so we shortened it a bit

 

Plastic cover mounting holes (between radiator and bumper)

 

Pump secured

 

Secured all cables under the TS

 

Connected oil recirc. hose

 

Shortened it a bit to fit perfectly

 

Brake booster hose connected and tightened

 

 

Injector Cover on!!

 

 

Pollen Filter housing

 

Cutting the extra long hoses

 

Almost done..

 

Brake booster

 

 

 

 

 

Strut bar

 

Wires & hose across the engine all setup

 

Modifying the plastic cover between bumper and radiator to fit.

 

 

Cable ties hold the heat exchanger hoses

 

DONE

 

 

This is a short video of the first TS2 start. More to follow

 

 

 

 

 

Page 5 of 5. Goto Page 2 Page 3 Page 4 Page 5